Stopping [Video Lesson]

  1. Close the jacket water inlet valves. Generally, the inlet is closed first, and then the outlet valve.
  2. Close the valve for feedwater treatment.
  3. Stop the fresh water pump.
  4. Switch off the salinometer.
  5. Stop seawater pump (also known as ejector pump).
  6. Open the vacuum valve.
  7. Close the seawater suction valve and overboard valve. This is generally not required as they are non-return valves. However, in case of valve leaking or damage, these valves are to be closed without fail.

 

Video Lesson – Fresh Water Generator Working

 

How Can We Help You?

Log in

Log in with Google

Log in with LinkedIn

Or

Don’t have an account? Register Now